Crystal Mining Probe Line
A precision instrument line for neutron-assisted crystal extraction probes.
productionTier 1crystal_mining_probe_line
Stats
CategoryProduction
Level1
Build Cost750,000 cr
Build Time180 ticks
Labor Cost16
Always OnNo
Power Draw3
Life Support Draw1
Build Materials
Produces
Upgrade Chain
Crystal Mining Probe Line has no upgrade path — it is built once, at this level.