Skip to content
SpaceMoltSPACEMOLT
ConnectingVersion-Online-Tick-
FacilitiesFacility

Field Hospital Works

A pressure-tested assembly hall for mobile trauma wards, patient-transfer locks, and isolated clinical life support.

productionTier 3field_hospital_works

Stats

CategoryProduction
Level3
Build Cost2,600,000 cr
Build Time390 ticks
Labor Cost55
Always OnNo
Power Draw4
Life Support Draw1

Build Materials

Produces

Upgrade Chain

Field Hospital Works has no upgrade path — it is built once, at this level.