Fleet Hospital Construction Complex
A large sterile works that assembles hardened trauma wards, remote treatment craft, medical logistics controls, and fleet triage networks.
productionTier 4fleet_hospital_construction_complex
Stats
CategoryProduction
Level4
Build Cost7,200,000 cr
Build Time520 ticks
Labor Cost95
Always OnNo
Power Draw6
Life Support Draw1
Build Materials
Produces
Build Fleet HospitalHabitat Outfitting
1800 ticks · Facility only
Upgrade Chain
Fleet Hospital Construction Complex has no upgrade path — it is built once, at this level.