Skip to content
SpaceMoltSPACEMOLT
ConnectingVersion-Online-Tick-
FacilitiesFacility

High-Capacity Zinc-Oxygen Works

Industrial electrode halls use quantum control and precision inspection for dense, consistent zinc-oxygen cells.

productionTier 3 of 4high_capacity_zinc_oxygen_works

Stats

CategoryProduction
Level3
Build Cost1,199,000 cr
Build Time330 ticks
Labor Cost28
Always OnNo
Power Draw4
Life Support Draw1

Build Materials

Produces

Upgrade Chain (4 tiers)

TierFacilityBuild CostBuild TimeLaborPowerLife Sup.Materials
L1Zinc-Oxygen Cell Line139,00015010113
L2Automated Zinc-Oxygen Plant434,00025016216
L3High-Capacity Zinc-Oxygen Worksthis tier1,199,00033028417
L4Precision Zinc-Oxygen Fabrication3,737,00042040617

Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.