Plasma Charge Containment Plant
An upgraded charge plant with parallel filling chambers, structural containment frames, and closed-loop cooling. Automated pressure checks keep high-volume field-grade plasma packs inexpensive and consistent.
productionTier 2 of 4plasma_charge_containment_plant
Stats
CategoryProduction
Level2
Build Cost248,000 cr
Build Time125 ticks
Labor Cost10
Always OnNo
Power Draw2
Life Support Draw1
Build Materials
Produces
Manufacture Standard Plasma ChargesConsumables
7.5 ticks · Facility only
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Plasma Charge Filling Line | 78,000 | 85 | 5 | 1 | 1 | 3 |
| L2 | Plasma Charge Containment Plantthis tier | 248,000 | 125 | 10 | 2 | 1 | 5 |
| L3 | Industrial Plasma Charge Works | 672,000 | 170 | 18 | 4 | 1 | 6 |
| L4 | Autonomous Plasma Charge Manufactory | 2,150,000 | 210 | 26 | 6 | 1 | 6 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.