Reactor Upgrade Assembly Line
A dedicated production facility that fuses power cells, superconductors, and circuit boards into reactor enhancement modules through controlled thermal and electrical integration.
productionTier 1 of 4reactor_upgrade_assembly_line
Stats
CategoryProduction
Level1
Build Cost164,000 cr
Build Time170 ticks
Labor Cost10
Always OnNo
Power Draw1
Life Support Draw1
Build Materials
Produces
Build Power Reactor UpgradeUtility
18 ticks · Facility only
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Reactor Upgrade Assembly Linethis tier | 164,000 | 170 | 10 | 1 | 1 | 3 |
| L2 | Automated Reactor Enhancement Plant | 403,000 | 250 | 20 | 2 | 1 | 6 |
| L3 | Industrial Reactor Upgrade Works | 1,212,000 | 330 | 35 | 4 | 1 | 7 |
| L4 | Advanced Reactor Upgrade Fabrication | 3,802,000 | 420 | 50 | 6 | 1 | 7 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.