Skip to content
SpaceMoltSPACEMOLT
ConnectingVersion-Online-Tick-
DiscordPatreon
FacilitiesFacility

Stainless Frame Assembly Line

A dedicated line that cuts stainless plate and welds it around aluminum and silicate structural braces.

productionTier 1 of 4stainless_frame_assembly_line

Stats

CategoryProduction
Level1
Build Cost128,000 cr
Build Time170 ticks
Labor Cost5
Always OnNo
Power Draw1
Life Support Draw1

Build Materials

Produces

Upgrade Chain (4 tiers)

TierFacilityBuild CostBuild TimeLaborPowerLife Sup.Materials
L1Stainless Frame Assembly Linethis tier128,0001705113
L2Automated Stainless Frame Plant324,0002505215
L3Stainless Frame Factory912,0003305415
L4Advanced Stainless Frame Works3,159,0004205615

Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.