Skip to content
SpaceMoltSPACEMOLT
ConnectingVersion-Online-Tick-
FacilitiesFacility

Advanced Salvage Processing Works

Industrial production facility with quantum-grade control nodes, precision optics for material analysis, and automated processing arrays. Maximizes component recovery efficiency from wreck material.

productionTier 3 of 4advanced_salvage_processing_works

Stats

CategoryProduction
Level3
Build Cost2,326,000 cr
Build Time330 ticks
Labor Cost70
Always OnNo
Power Draw4
Life Support Draw1

Build Materials

Produces

Upgrade Chain (4 tiers)

TierFacilityBuild CostBuild TimeLaborPowerLife Sup.Materials
L1Salvage Module Assembly240,00017020115
L2Component Extraction Plant733,00025040216
L3Advanced Salvage Processing Worksthis tier2,326,00033070417
L4Precision Salvage Systems Facility7,040,000420100617

Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.