Skip to content
SpaceMoltSPACEMOLT
ConnectingVersion-Online-Tick-
FacilitiesFacility

Component Extraction Plant

Medium-scale facility with dedicated sensor calibration and processing core configuration stations. Increased output supports larger salvage operations.

productionTier 2 of 4component_extraction_plant

Stats

CategoryProduction
Level2
Build Cost733,000 cr
Build Time250 ticks
Labor Cost40
Always OnNo
Power Draw2
Life Support Draw1

Build Materials

Produces

Upgrade Chain (4 tiers)

TierFacilityBuild CostBuild TimeLaborPowerLife Sup.Materials
L1Salvage Module Assembly240,00017020115
L2Component Extraction Plantthis tier733,00025040216
L3Advanced Salvage Processing Works2,326,00033070417
L4Precision Salvage Systems Facility7,040,000420100617

Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.